December 2019 Projects

The November List

• Replace back door
• Pipe two pieces of the tunikurti
• Install garden gate
• Install kitchen faucet
• Hexify six fat quarters (tbh I don't remember)
• Fix straps of travel bag
• Lay out veil
• Sew rayon skirt
• Sew skirt mockups
• Figure out Christmas presents (eek)
• Sew up front window curtains
• Wash even more wool

Where did all my time go??? Well, the gate took a bit, and so did the door, and I not only finished the cotton hexagons, but also made the silk ones, and started stitching them up.

Otherwise, uh...well...I started planning a kitchen remodel? And went to a talk on Hmong textiles, which was delightful and inspiring, and may result in complexifying a project I'd like to do before next spring.

The December List

• Make four strips quilt
• Install bottom mirror
• Hexify silks
• Fix straps of travel bag
• Lay out veil
• Sew rayon skirt
• Sew skirt mockups
• Sew up front window curtains
• Reorganize studio
• Fit green saree blouse
• Finish saree petticoat
• Blue print cotton skirt
• Blue print cotton shirt
• Blue print cotton cami
• Finish and paint indoor drying rack
• Hang indoor drying rack

I have such high ambitions...but also, I think this can be done. If I focus. Now that I don't have hexagon basting occupying the vast majority of my crafting time, I'm hoping to get some delayed clothing projects done, along with a few in-progress house items.

Comments