February 2020 Projects

The January List

• Make four strips quilt
• Fix gutters (weather permitting)
• Make two corset mockups
• Install bottom mirror
• Lay out veil
• Sew rayon skirt
• Sew skirt mockups
• Sew up front window curtains
• Reorganize studio (more)
• Install top mirror
• Install mirror frame
• Stitch up existing strips quilt
• Mend work jeans
• Finish Socktober socks
• Finish and paint indoor drying rack
• Hang indoor drying rack

Update: if you prayed for me, it didn't work.

On the other hand, it was a good month for planning and prep work for many of the items I'd hoped to finish, and I'm looking forward to getting several of them finished in February instead. Plus, now I have work jeans in which to do all the construction on the list.

The February List

• Make four strips quilt
• Fix gutters (weather permitting)
• Make two corset mockups
• Install bottom mirror
• Lay out veil on real fabric
• Sew Sabriel surcoat
• Embroider Sabriel surcoat
• Sew up front window curtains
• Reorganize studio (more)
• Install top mirror
• Install mirror frame
• Stitch up existing strips quilt
• Mend two pairs socks
• Finish Socktober socks
• Finish and paint indoor drying rack
• Hang indoor drying rack
• Put up garden fence
• Set up rain barrels

The quilt and the gutters probably won't happen this month, but I'm leaving them on the list just in case I do finally manage to crack the code locking me to this singular timeline.

Otherwise it looks like crafting on lunch breaks, and building projects whenever I'm home.

Comments